Sort List: Project Name | Client | City | Architect | Gen. Contractor
Pages:  1 2 3 4 5
OCP PROJECTS • ALL PROJECTS
View Project File
Ashwood Commons
Bellevue, WA

The painting team used more than thirty colors in the interior and exterior painting of this 22 story residential tower in Bellevue’s downtown core. The building also contains 18,000-square-feet of retail space and a lower level parking garage.



View Project File
Department of Global Health, University of Washington
Seattle, WA

As part of an extensive tenant improvement to the lab facility, WCP painted the interior of the laboratory, as well as applied high performance epoxy coatings to lab testing rooms. The Department of Global Health was founded in 2006 as a joint venture between the University of Washington School of Medicine and the School of Public Health and Community Medicine made possible by a $20 million grant from the Bill & Melinda Gates Foundation.



View Project File
Evergreen Hospital
Kirkland, WA

WCP crews painted the shell and core of Evergreen Hospital’s new nine-story Public Inpatient Facility that will provide up to 192 patient beds, giving the center the ability to expand its critical care and surgery services. In addition to the interior and exterior painting work, WCP applied water repellent coatings to all brick surfaces.



View Project File
Harbor Club
Bellevue, WA

This project involved a complete repaint of walls, ceilings, base, chair rail, crown moulding and other misc. trim. WCP also installed new wallcovering in the elevator lobby including a beautiful woven leather material.



View Project File
Hilton
Bellevue, WA

The renovation of this well-appointed and conveniently located hotel in Bellevue, Washington had many time constraints and budget limitations that required WCP to perform multiple duties outside the usual scope of a painting contractor. WCP placed extensive scaffolding within the hotel’s seven-story glass atrium in order to demolish the existing wall decorations and repair and apply new textured coatings and finishes on various levels. As part of the total lobby re-model, the crews restored existing oak paneling, doors and trim in the ballrooms and pre-function areas. WCP also applied Duroplex plaster finishes in new European style restaurant. The work was completed on time and performed while the hotel was occupied.



Featured Project
// Script for DemandBase Stream